• Secondary Schools

    Vita delivers maximum value by incorporating innovation and knowlege into the design and construction of school buildings.

  • Primary Schools

    We have utilised our offsite manufacturing within this sector to construct buildings quickly and to the highest standard possible.

    View »

  • Secondary Schools

    Our schools are designed to be flexible and to resond to future changes in education.

  • Flexible Interiors

    Schools need to be able to respond to daily changes as well as longer term trends.

  • Building Information Modelling

    We use BIM to manage risk and data and to ensure we have a coordinated design and construction process.

1 2 3 4 5

BIG BIM

When developing our schools range we have taken a whole life view. In the past schools have been designed without a great deal of consideration for the future lifecycle implications.

We have used a BIG BIM approach when developing the range. there are 4 defined stages which have to be considered to deliver BIG BIM

1. Define and Validate

2. Design and Prototype

3. Manufacture and Assemble

4. Operate and Maintain

All of the 4 stages are interlinked to ensure that holistic decisions are made to maximise value.We use Building Information Modelling to ensure the data is consistant and can be used at each stage. 

Join Our Mailing List